•Paving the first tile, leave more than 2mm (use with cross spacer). Close to the tiles.
•Insert T-shaped needle along the gap in the tile.
•Then 180 degree rotation,T-shaped needle stuck at the bottom of the two tiles.
•Adjust the caps with your hand/special wrench until the two tiles are on the same level.
•About 5-6 hours after leveling, Before cement/adhesive is completely dry, rotate caps in the reverse direction, remove 180° T-needle until the word, take out.